Buying Kravet Fabric by the Yard for a Commercial Project: A 7-Step Purchasing Checklist

A facilities-and-procurement checklist for buying Kravet upholstery, drapery, bedding, and outdoor fabric by the yard — from memo samples and spec sheets to pattern-repeat math, minimums, and the freight-claim window most buyers miss.

I'm the office administrator for a 180-person company, and facilities purchasing lands on my desk. Furniture refresh, conference-room drapery, the occasional client-lounge reupholstery. I spend somewhere between $40,000 and $60,000 a year on soft goods across three locations, and I report to both operations and finance — which means I get the "why did this cost so much" conversation and the "why doesn't the invoice match the PO" conversation.

This is the checklist I run when I'm buying Kravet by the yard, or honestly any premium fabric from any mill. Seven steps. If you're new to sourcing for a commercial space, this will keep you out of a reorder. If you've been doing it for a few years, you'll probably recognize at least two of these from a project that went sideways.

Step 1: Nail the style number and colorway first

Kravet does not sell "the blue chenille." They sell a style number in a specific colorway. If your designer or your internal stakeholder hands you a photo from a showroom, that photo is not a purchase order.

Get three things in writing before you do anything else: the full style number, the colorway name or number, and the product category (upholstery, drapery, bedding, outdoor). I've had a stakeholder ask for "the green one" and we spent two days reconciling three different greens from three different Kravet collections — one was discontinued, one was a contract-only fabric, and one was the actual answer. The whole delay would have been avoidable by asking for a style number.

Step 2: Order a physical memo. Do not trust your monitor.

A memo is the physical sample cut a mill or distributor sends out for approval. It's usually a few inches, and it is the only honest version of the color you're going to get before the delivery truck shows up.

Why does this matter? Because a 24-inch sample photographed under showroom lighting, compressed to a JPEG, and viewed on a factory-calibrated monitor is still not the fabric. Eyeballs vary. Monitors vary more. Industry color tolerance standards (Pantone is a reasonable reference point) treat anything above a couple of Delta-E as noticeable to most people — and by the time a fabric rolls onto a frame in your client lounge under fluorescent office lighting, small shifts read differently than they did on somebody's phone screen.

Get the memo. Put it against the wall in the room where the fabric is actually going to live. Then approve.

Step 3: Read the performance spec sheet, not just the swatch description

This is the step most people skip, and it's the one that decides whether the fabric still looks good in year three. Three numbers I always pull:

  • Double rubs (Wyzenbeek in the US, Martindale in Europe). For contract and hospitality use, 30,000 double rubs is the practical floor. High-traffic lobby or classroom seating? Look for 51,000 or more. Residential seating can go lower, but you're the buyer — make that call knowingly.
  • Cleaning code. S = solvent only. W = water-based. SW or WS = either, and your facilities crew needs to know which is preferred. Chenille is a common offender here: it looks bulletproof, and then somebody wipes it with the wrong cleaner and it mats.
  • Lightfastness rating. Usually an AATCC reference. If the fabric is going near a window, ask what the rating is. Kravet's performance collections usually publish this; if you can't find it in the tear sheet, ask.

I'm not 100% sure every Kravet SKU publishes all three, but a reputable distributor will get you the answers before the order goes in.

Step 4: For outdoor, check the substrate — not just the marketing name

"Outdoor" is a category, not a spec. Two outdoor fabrics can look identical and behave completely differently after one summer.

What to ask:

  • Substrate. Solution-dyed acrylic holds UV and bleach best. Polyester with a topical finish is cheaper and typically fades faster. Olefin is somewhere in the middle.
  • Finish. DWR (durable water repellent) is not the same thing as waterproof. If the piece is going to sit in rain, know which one you're buying.
  • UV hours. If it isn't published, ask. 500 hours of xenon-arc testing is a different product than 1,500.

This is where I made my worst assumption. I bought an outdoor-grade fabric for a client patio, saw "outdoor" on the spec sheet, and treated that as the whole story. By the following spring, the color had pulled noticeably toward purple. The finish was fine. The substrate was wrong for that level of direct sun. The spec sheet would have told me if I'd read it more carefully.

Step 5: Do your yardage math with the pattern repeat

Most reorders and mismatched panels get born right here. You measure the sofa, you measure the window, you add 10%, and you order. That's not enough if the fabric has a pattern.

Two things to add to your number:

  • Vertical repeat. For drapery and any piece where two panels sit side by side, you lose yards to matching the pattern at the seam. A 25-inch vertical repeat means you may lose almost a yard per cut just lining up the motif.
  • Railroad or up-the-roll. Railroaded fabric is run horizontally; if the pattern needs to align with a particular orientation, that changes your cut yield. Ask which way the pattern runs before you approve yardage.

Doubling up around the repeat is the step I see skipped most often. It looks tedious. It saves an entire second order. After the third time I watched a reupholstery job come up a half-yard short, I stopped treating repeat math as optional.

Step 6: Confirm minimums, cut length, and lead time — in writing

Luxury mills are not always the same as fabric warehouses. Some Kravet styles ship from stock within a few days. Some are cut-to-order and take four to six weeks. Some have a short minimum on certain items. Discover which one you're buying before you promise an install date to operations.

I've learned this the hard way twice. The first time, I said "as soon as possible" to a sales rep and heard back a date that sounded reasonable — until I realized we had two different definitions of the word, and mine was two weeks earlier than theirs. The second time, I skipped asking about cut length on a short yardage order and got a quote for a length we couldn't actually buy in one piece.

Here's the part I'd say to any rep reading this: small orders are not a favor. A five-yard order from a small firm today is a thirty-yard order from that same firm in three years, or it isn't — but the way the small order was handled goes a long way toward deciding which one. The vendors I still buy from years later are the ones who took the $200 orders as seriously as the $20,000 ones. Cutting off small customers is cutting off your own pipeline.

The other side of it, as a buyer: don't treat "small" as a negotiating position, either. Ask for the terms clearly and get them confirmed. Respect goes both directions.

Step 7: Lock invoicing, freight terms, and the damage-claim window before the PO goes out

This is the step that sounds boring and is responsible for most of the emails I send after a delivery.

Before you release the PO, know three things:

  1. Who invoices what. If you're buying through a distributor or a dropship arrangement, the invoice may not come from the same entity that appears on the PO. Finance will reject a mismatch, and then you're the one explaining it.
  2. Freight terms. FOB origin means damage is your problem the moment the roll leaves the mill. FOB destination means it's their problem until it arrives. If you're not sure which one your order falls under, ask.
  3. Damage-claim window. Freight carriers have surprisingly short windows for visible-damage claims — sometimes measured in hours or a couple of days. Inspect the roll on the dock. Do not sign clean and then open it in the workroom three days later.

I knew I should have insisted on opening the wrap before signing, but I thought "we've worked with this carrier for years, what are the odds?" Well, the odds caught up with us when a shipment arrived fine on the outer wrap and water-stained on the inner rolls. We signed, opened it two days later, and by then the claim window had closed. That cost us the whole roll and a PO reissue on a tight schedule. Now I check freight terms before the PO leaves and inspect on arrival. Either habit would have saved us; both together, I haven't had a repeat.

Notes and common mistakes

A few things I'd add, because they don't fit neatly into a step:

  • Dye lots. Fabrics from different dye lots can read slightly different even when the SKU is identical. If you're matching an existing panel to a new one, order both at the same time if you can. If you can't, ask the distributor to match lots on the order.
  • Discontinued styles. Kravet retires styles regularly. If your project runs for months, confirm availability at the start and again before the order goes in. I've had a style go discontinued between sample approval and PO.
  • Flame-retardant requirements. Commercial drapery in most US jurisdictions has to meet NFPA 701, and the test has been revised over the years. If your project requires it, ask for documentation — don't assume it's covered.
  • Keep the memo. For at least a year. If a delivery looks off, the memo is your proof.

That's the checklist. Seven steps, plus a few things I've picked up by not doing them. None of it is glamorous — it's the paperwork behind the pretty fabric. Which is honestly most of the job.

Peter Wekesa

Peter Wekesa is a textile-reinforcement and prepreg analyst covering carbon, glass, aramid and basalt fabrics, woven roving, unidirectional tapes, multiaxial reinforcements, meshes, and resin-impregnated materials. He applies ISO 4602 yarn-count methods while measuring fibre areal weight, tow size, warp and weft density, orientation, crimp, resin content, tack, out-time, storage temperature, cured thickness, and defect rate. His engineering guides help composite fabricators, construction specialists, and mobility suppliers coordinate layup design, handling limits, traceability, process windows, and incoming-material acceptance.